Home Services Recent Projects Profile Contact
Services

Groundwater Dewatering

Many engineering construction projects involve excavating into water bearing soil in which it is essential to maintain safe operating conditions during construction by keeping water levels below the bottom of the excavation. Additionally, some structures such as highways in low-lying areas may also be susceptible to flooding and require a permanent dewatering network.

Whether your dewatering needs are of a temporary or permanent nature, TBirdie Consulting has extensive experience in designing optimal and cost-effective dewatering systems under a wide range of operating conditions.

Ground & Surface Water Modeling
GIS Customization
Contaminant Transport Investigations
Wellfield Design
Wellhead Protection Area Delineation
Wellfield Energy Optimization
Distribution System Analysis & Design
Saltwater Intrusion Modeling
Groundwater Dewatering
MODFLOW Training and Support